{"id":25318,"date":"2019-08-06T02:34:27","date_gmt":"2019-08-06T06:34:27","guid":{"rendered":"http:\/\/www.wvih.com\/wp1\/?p=25318"},"modified":"2019-08-15T21:34:15","modified_gmt":"2019-08-16T01:34:15","slug":"work-begins-on-ky-361-and-31w-intersection-in-elizabethtown","status":"publish","type":"post","link":"https:\/\/www.wvih.com\/wp1\/index.php\/2019\/08\/06\/work-begins-on-ky-361-and-31w-intersection-in-elizabethtown\/","title":{"rendered":"Work Begins On KY 361 and 31W Intersection In Elizabethtown"},"content":{"rendered":"<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" data-attachment-id=\"21787\" data-permalink=\"https:\/\/www.wvih.com\/wp1\/index.php\/2018\/12\/07\/officials-kick-off-i-65-interchange-in-bullitt-county\/road-construction-ahead\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.wvih.com\/wp1\/wp-content\/uploads\/2018\/12\/road-construction-ahead.jpg?fit=600%2C442&amp;ssl=1\" data-orig-size=\"600,442\" data-comments-opened=\"1\" data-image-title=\"road construction ahead\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/www.wvih.com\/wp1\/wp-content\/uploads\/2018\/12\/road-construction-ahead.jpg?fit=600%2C442&amp;ssl=1\" src=\"https:\/\/i0.wp.com\/www.wvih.com\/wp1\/wp-content\/uploads\/2018\/12\/road-construction-ahead.jpg?resize=300%2C221\" alt=\"\" width=\"300\" height=\"221\" class=\"alignnone size-medium wp-image-21787\" srcset=\"https:\/\/i0.wp.com\/www.wvih.com\/wp1\/wp-content\/uploads\/2018\/12\/road-construction-ahead.jpg?resize=300%2C221&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.wvih.com\/wp1\/wp-content\/uploads\/2018\/12\/road-construction-ahead.jpg?w=600&amp;ssl=1 600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><br \/>\nA project that eventually will realign the Ky. 361 and U.S. 31W intersection in Elizabethtown begins this week.<!--more--><\/p>\n<p>Ky. 361, which is known as Patriot Parkway, will continue beyond the U.S. 31W Bypass following the approximate path of Cardinal Drive and connect with North Dixie Avenue at the traffic signal at Diecks Drive.<\/p>\n<p>Work begins Wednesday with construction of a retaining wall that is being placed between the southern Hardin Memorial Health parking lot and the existing roadway. A $2.73 million contract was awarded May 31 to Phillips Brothers for the work.<\/p>\n<p>With coordination between the contractor and Hardin Memorial Health, a portion of the parking lot will be closed. No significant traffic impacts on adjacent public roads are expected, according to a Kentucky Transportation news release. However, with workers and equipment in the vicinity, motorists should be aware and exercise additional caution.<\/p>\n<p>The emergency entrance to the hospital will not change during this phase of work.<br \/>\nSource: NE<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A project that eventually will realign the Ky. 361 and U.S. 31W intersection in Elizabethtown begins this week.<\/p>\n","protected":false},"author":31,"featured_media":21787,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[59],"tags":[],"class_list":["post-25318","post","type-post","status-publish","format-standard","has-post-thumbnail","category-news","entry"],"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p6aKAp-6Am","jetpack-related-posts":[],"jetpack_likes_enabled":true,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.wvih.com\/wp1\/wp-content\/uploads\/2018\/12\/road-construction-ahead.jpg?fit=600%2C442&ssl=1","_links":{"self":[{"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/posts\/25318","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/users\/31"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/comments?post=25318"}],"version-history":[{"count":1,"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/posts\/25318\/revisions"}],"predecessor-version":[{"id":25319,"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/posts\/25318\/revisions\/25319"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/media\/21787"}],"wp:attachment":[{"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/media?parent=25318"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/categories?post=25318"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/tags?post=25318"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}