{"id":32266,"date":"2020-12-23T02:23:22","date_gmt":"2020-12-23T07:23:22","guid":{"rendered":"http:\/\/www.wvih.com\/wp1\/?p=32266"},"modified":"2021-01-02T19:23:06","modified_gmt":"2021-01-03T00:23:06","slug":"brent-spence-bridge-reopens","status":"publish","type":"post","link":"https:\/\/www.wvih.com\/wp1\/index.php\/2020\/12\/23\/brent-spence-bridge-reopens\/","title":{"rendered":"Brent Spence Bridge Reopens"},"content":{"rendered":"<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" data-attachment-id=\"14444\" data-permalink=\"https:\/\/www.wvih.com\/wp1\/index.php\/2017\/06\/23\/maintenance-begins-on-brent-spence-bridge\/brent-spence-bridge\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.wvih.com\/wp1\/wp-content\/uploads\/2017\/06\/Brent-Spence-Bridge.jpg?fit=220%2C165&amp;ssl=1\" data-orig-size=\"220,165\" data-comments-opened=\"1\" data-image-title=\"Brent Spence Bridge\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/www.wvih.com\/wp1\/wp-content\/uploads\/2017\/06\/Brent-Spence-Bridge.jpg?fit=220%2C165&amp;ssl=1\" src=\"https:\/\/i0.wp.com\/www.wvih.com\/wp1\/wp-content\/uploads\/2017\/06\/Brent-Spence-Bridge.jpg?resize=220%2C165\" alt=\"\" width=\"220\" height=\"165\" class=\"alignnone size-full wp-image-14444\" \/><br \/>\nGovernor Andy Beshear and Kentucky Transportation Cabinet Secretary Jim Gray announced the end of a six-week emergency repair project to restore and reopen the Brent Spence Bridge one day ahead of the scheduled completion date as it reopened late Tuesday (12\/22) afternoon.<!--more--><\/p>\n<p>The Brent Spence Bridge, which carries Interstates 71 and 75 over the Ohio River between Covington, Kentucky and Cincinnati, Ohio closed on November 11, 2020, due to a crash and fire involving two commercial vehicles. Multiple safety inspections took place throughout the course of the repair project; the final inspection was completed Monday evening, paving the way for the gradual reopening of the bridge and the travel lanes and ramps that support access to it.<\/p>\n<p>An assessment of damage to the bridge began as soon as inspectors could safely access the site. A team of more than 20 national and local bridge inspectors surveyed the entire, two-deck span and conducted tests to ensure the structure\u2019s integrity was not compromised. Less than a week after the closure, the Kentucky Transportation Cabinet awarded a $3.1 million contract to prime contractor, Kokosing Construction Company, of Westerville, Ohio, with a target reopening date of December 23.<br \/>\nRepairs to the bridge included:<br \/>\nReplacing 16 steel beams that were damaged by the fire<br \/>\nPouring new upper deck driving surface and concrete barrier wall<br \/>\nPouring new layer of concrete on lower deck and new concrete barrier wall<br \/>\nRemoving and installing drainage system<br \/>\nInstalling new overhead lights<br \/>\nRestriping new concrete on upper and lower decks<\/p>\n<p>The Brent Spence Bridge is structurally sound and is part of the region\u2019s long-term infrastructure plan; a new companion bridge is needed to support additional capacity.<\/p>\n<p>The Brent Spence Bridge, which was designed to carry 80,000 to 100,000 vehicles per day, now carries approximately twice that across the Ohio River. Discussions continue between the Kentucky Transportation Cabinet and its partner agency, the Ohio Department of Transportation, about plans to build a companion bridge to the west of the existing bridge to increase capacity.<\/p>\n<p>Given the expectation that the existing bridge will remain in service for many years to come, ensuring the long-term safety of the bridge and the routes leading to and from it is of increased significance.<\/p>\n<p>The Kentucky Transportation Cabinet crews completed a number of maintenance projects on and around the bridge while traffic was restricted to minimize future traffic interruptions and maximize efficiency. These included significant drainage repairs on the northbound side of I-71\/75, just south of the bridge; cleaning overhead signs on the lower deck, and repaving and restriping the northbound approach lanes.<\/p>\n<p>Secretary Gray also announced plans for the Cabinet to install new hazardous material signage in Northern Kentucky to increase awareness of the long-standing hazardous material restriction north of I-275 between I-71\/75 and the Ohio state line.<\/p>\n<p>The U.S. Department of Transportation authorized up to $12 million in emergency relief reimbursement funding for the repair project, but Secretary Gray said the final expenses likely will be as little as half that amount.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Governor Andy Beshear and Kentucky Transportation Cabinet Secretary Jim Gray announced the end of a six-week emergency repair project to restore and reopen the Brent Spence Bridge one day ahead of the scheduled completion date as it reopened late Tuesday (12\/22) afternoon.<\/p>\n","protected":false},"author":31,"featured_media":14444,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[59],"tags":[],"class_list":["post-32266","post","type-post","status-publish","format-standard","has-post-thumbnail","category-news","entry"],"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p6aKAp-8oq","jetpack-related-posts":[],"jetpack_likes_enabled":true,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.wvih.com\/wp1\/wp-content\/uploads\/2017\/06\/Brent-Spence-Bridge.jpg?fit=220%2C165&ssl=1","_links":{"self":[{"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/posts\/32266","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/users\/31"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/comments?post=32266"}],"version-history":[{"count":1,"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/posts\/32266\/revisions"}],"predecessor-version":[{"id":32267,"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/posts\/32266\/revisions\/32267"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/media\/14444"}],"wp:attachment":[{"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/media?parent=32266"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/categories?post=32266"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wvih.com\/wp1\/index.php\/wp-json\/wp\/v2\/tags?post=32266"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}