
It is the end of an era for Western Kentucky University as demolition is underway to tear down Bemis Lawrence Residence Hall
Construction will begin soon on the new residence hall going in its place. Once done Barnes Campbell Hall will be torn down and a second new building will go in its place.
It is all part of the first-year village, a 10-year plan for Housing and Residence Life to improve the on-campus housing.
Currently, crews are finishing up the internal demolition and in about two weeks they will start the external work of bringing the building to the ground.
The 48 million dollar project will build new pod-style housing, which is traditional rooms, but smaller groups of students per resident assistant.
The two new residence halls are meant to create a stronger freshman experience.
Bemis Lawrence and Barnes Campbell both opened in 1966.
The two new residence halls will feature more study spaces, classrooms, and music practice spaces/recording studios. The first building holds 260 students and the second holds 375 students.
Officials say building Hilltopper Hall provides swing space for those students coming this fall to fill the void of Bemis Lawrence.
Barnes Campbell will remain open until spring 2021 and be torn down that fall.
Source: WBKO
You must be logged in to post a comment.